Planning

By , September 29, 2009 4:24 am

Methodology of planning:

Socio – Economic Survey:

The socio – economic survey was conducted in all six villages of the cluster Project Area. A simple profoma was designed for collection of data’s (Time Line, Social Mapping, Metric ranking, wealth ranking and chapatti diagram). The people of the Project Area were personally enquired by the members of the survey team for getting maximum possible information.

Sample Proforma:

Period

1950

Name of village Yield from Forest product Fuel Infrastructure
Mawkasain +++ Firewood Nil
Mawkaphan +++ Firewood Nil
Domskong +++ -do- Nil
1990 Mawkasain +++ -do- Nil
Mawkaphan +++ -do- Nil
Domskong +++ -do- Nil
2008 Mawkasain +++ -do- Nil
Mawkaphan +++ -do- Nil
Domskong +++ -do- Nil

Wealth ranking before the project:

Names of the villages Poor Poorest Medium Rich
Mawkasain ++++ +++++++ +++++ +++
Mawkaphan +++++ ++++++++ +++ ++++
Domskong +++++ ++++++ ++++ ++
Kenbah ++++++ ++++++++ +++++ +++
Kenmynsaw ++++++ ++++++ ++++ ++
Jympiad +++++++ ++++++++ ++++++++ +++

Population in the project area: 4500 Aprox

Occupation of the  people under the area: Agriculture is the main occupation in the area, cattle- rearing, farming, handicrafts and animal husbandry are also being practiced at a lower production.

Resources in the project area: Bamboos and other forest products are the main resources of the area.

Transportation: Jeep and public carrier (truck) are the only means of transport.


Leave a Reply


one × 3 =

Panorama Theme by Themocracy